Skip to content
Faith Forge LabsBosnia systems bridge

Data-law map / 2025 framework

Connect every data field to a purpose and responsible owner

The current framework is a reason to understand the real data flow, not to paste legal language onto a generic privacy page. Engineering records the categories, purpose, access, movement, retention, request path, and unresolved decisions.

Current source
Official 2025 law text
Engineering default
Collect less
Applicability
Qualified human decision
Prepare the project brief
Span 1

Define the controller and processor story

For each workflow, identify who decides why and how data is processed, who performs processing, which vendors or organizational units participate, and who responds to people. Faith Forge Labs can document and implement the chosen model but does not assign legal roles on the client’s behalf.

  • Purpose and data owner
  • Processor and vendor inventory
  • Access and support roles
  • Contact for rights and incidents
Span 2

Treat transfers and copies as architecture

Exports, email attachments, cloud hosting, analytics, backups, logging, support access, integrations, and AI tools may create additional copies or cross-border access. Map the exact data and path. Minimize payloads, separate environments, protect secrets, limit privileges, and obtain the required client/specialist decision before release.

  • System and country map
  • Retention per copy
  • Backup and deletion behavior
  • Privileged access evidence
Span 3

Prove the approved mechanism

Tests can show that notices render, optional fields behave, roles restrict access, audit records exist, export/delete/correction workflows run, retention jobs operate, and incident contacts are reachable. Those results are technical evidence for review, not a legal certification or guarantee.

  • No real personal data in fixtures
  • Rights-request test path
  • Retention and deletion evidence
  • Known limitations documented
arrival point

Draw the data map with the people who own it

List each user, field, system, vendor, copy, access role, retention rule, and responsible decision maker before selecting controls.

Prepare the project brief